Press releases
Kosovo municipalities did not improve the living conditions for PSN29.12.2015According to the Office of the Auditory General (OAG), the four major municipalities of Kosovo, Prishtina, Prizren, Peja and Gjilan, including the central level of government, have not been effective and efficient with their actions in improving the living condition of Persons with Special Needs namely Persons with Disabilities(PD).
Download
Municipalities should increase control over the costs of representation and fuel13.10.2015Municipalities of Kosovo have no written policies for expenses of representation or sufficient controls for fuel consumption. According to a document of the Office of the Auditor General (OAG) (access to the link: http://oag- rks.org/repository/docs/Treguesit_e_performances_se_komunave_2014_Shqip_938871.pdf), even large municipalities are no exception in this regard. Therefore the majority of them appear on the list of the 'luxury' consumers, based on financial statements 2014.Download
The largest Municipal Assemblies of Kosovo with law violations21.10.2015During the first nine months of this year, the largest Municipal Assemblies of Kosovo took decisions, in certain cases that were inconsistent with the provisions of the applicable laws. During this period of time, based on the assessments conducted by the Ministry of Local Government and Administration it appears that two breaches were identified in MA of Gjakova, while one legal breach was identified in each Municipality of Prishtina, Prizren, Ferizaj and Gjilan. Meanwhile no violations were identified in the Municipality of of Peja and South Mitrovica.
Download
Progress Report confirms the need for increased transparency in Kosovo Municipalities12.11.2015The European Commission Report on Kosovo for 2015, once again highlighted the need for the local government level to increase transparency in decision-making, which is consistent with the constant calls of civil society in Kosovo. Another issue underlined in the report, where also the parallels with Kosovo municipalities can be drawn, deals with the inadequacy of budgetary transparency.
Download
Law violations in neighbouring Municipal Assemblies of Prizren25.11.2015Neighbouring Municipal Assemblies of Prizren, during this year, in certain cases, have made decisions that are not in accordance with the legislation in force. Based on the assessments of the Ministry of Local Government Administration, it can be noted that in MA of Suhareka, Malisheva and Rahovec are evidenced legal violation, one violation each, whereas in MA of Mamusha, Dragash and Shterpca were not evidenced such cases.
Download
Major municipalities in Kosovo with less property tax revenue16.12.2015The nine-month financial report for the budget of the Republic of Kosovo, drafted by the Ministry of Finance, highlights the fact that almost all major municipalities in the country had a decrease in property tax collection. An exemption is only the Municipality of Prizren, which managed to collect more property tax revenues compared to the same period of the previous year.
Download
Neighboring municipalities of Prizren should increase the financial transparency29.09.2015Neighboring municipalities of Prizren are still coping with challenges in respect to the financial transparency with the public. Municipalities of Rahovec, Suharekë, Dragash, Mamushë, Shtërpce and Malishevë, shall increase their efforts in providing statements on the implementation and expenditures of funds from the municipal budget.
The executive officials of these municipalities have enabled the access to public files for the monitors of EC Ma Ndryshe, respectively they have provided financial reports for the period of January-June 2015, although there were delays registered in this respect.Download
Ferizaj municipal authorities violate the principles of transparency23.09.2015The last meeting of the Committee for Policy and Finance as well as the session of the Municipal Assembly during this week was organized in contradiction with the legal provisions, which oblige municipal authorities to be more transparent with the public.
Download
Inconsistent recruitment of school directors in Kosovos municipalities 15.09.2015The vacancy announcement for the selection of school directors and deputy directors published
by the Human Resource Office of the Municipality of Prizren - contested by the Education
Inspectorate and the Ministry of Education, Science and Technology underlines the lack of
harmonized legislation and procedures at state level on recruiting primary and secondary school
managers.Download
MUNICIPALITY OF PRIZREN WITH DEFICIENCIES IN APPLICATION OF THE LAW ON ACCESS TO THE PUBLIC DOCUMENTS13.07.2015NGO EC Ma Ndryshe within the project Index of the Reform on Municipal Transparency has reviewed the efficiency of Prizren Municipality in enabling access to the public documents in accordance with the appropriate Law.
Statistikat e kërkesave të EC-it, vonesatDownload
Statistikat e kërkesave të EC-it, vonesatDownload
Elected and Appointed Municipal Assembly Members in Mamushë to Renounce from the Non-Parliamentarian Language 02.03.2015Within the Online Transparency Monitoring Project for the Municipality of Mamushë, EC Ma Ndryshe followed the regular session of the Municipal Assembly of Mamushë. Download
Public Parking Places in Prishtina Continue to Pose Problem for the City18.02.2015Within Online Transparency Project, EC Ma Ndryshe over the period of several months followed the developments related to widely promoted project of public parking spaces. Its designing aimed at resolving the heavy traffic in the Prishtina city was introduced to the public by the Municipality of Prishtina in August last year.Download
Municipality of Prizren Closed 2014 with Outstanding Bills Amounting to EUR 2.2 Million16.02.2015Within the project of Prizren Municipal Executive Transparency Monitoring, during February EC Ma Ndryshe analyzed the Annual Financial Report of the municipality of Prizren for January-December 2014.Download
Commuting teachers facing difficulties in transportation 12.02.2015Ec Ma Ndryshe, within its project for online monitoring of transparency of the executive branch of Municipality of Prizren, during the month of February has researched the issue of transportation of commuting teachers in the Municipality of Prizren. Download
Municipality of Mamusha risks its own financial sustainability 09.02.2015Ec Ma Ndryshe, within its project for online monitoring of transparency of the executive branch of Municipality of Mamusha, analyzed the contents of the Annual Financial Report for 2014. Download
Prizren Municipal Administration Worsens its Poor Budgetary Performance15.01.2015Within the scope of its project for monitoring online transparency of Prizren municipal authorities during the month of January, EC Ma Ndryshe NGO made an analysis to the January 10 December 2014 Work Report of the Economy and Finance Directorate.Download
Undefined boundaries, the main issue of Historic Centre of Prishtina24.11.2014Last month, within the Online Transparency project, EC Ma Ndryshe has published its study report Historic Centre of Prishtina counts its last days, in which, amongst others, significant issues are exposed related to its missing legal protection, preceded by its undefined boundaries. Download
Poorly planned capital projects harming the municipal budget09.10.2014Within the project of monitoring transparency of local governance of Prizren, EC Ma Ndryshe during September has looked at several capital projects funded from the municipal budget.Download
Historic Centre of Prishtina counts its last days03.10.2014In the framework of the project for monitoring transparency of the municipal government , EC Ma Ndryshe, over the past weeks has tracked the application of legal requirements for consultations with the public during the budget preparation process.Download
Issues related to works in Great Hamam of Prishtina seem to have no end25.09.2014Within the Online Transparency project, EC Ma Ndryshe during JuneSeptember launched a research on conservation and restoration works in cultural heritage buildings in Prishtina. After noting numerous problems that are accompanying the works in both Çarshia (Bazaar) Mosque and Jashar Pashas Mosque, the research continues to look at the conservation works of Prishtinas Great Hamam.Download
Lack of access to drinking water, deprivation of human rights23.09.2014Within the project of monitoring transparency of Prizrens municipal government, EC Ma Ndryshe has received complaints from citizens of various local communities that have raised concerns about the drinking water supply.Download
Municipality of Mamuşa/Mamushë failing in budget transparency19.09.2014In the framework of the project for monitoring transparency of the municipal government, EC Ma Ndryshe, over the past weeks has tracked the application of legal requirements for consultations with the public during the budget preparation process.Download
Municipality of Prizren loses sight of its UNESCO Conference 05.08.2014Within the project of monitoring the transparency of Prizrens municipal executive, EC Ma Ndryshe, over the last months, has looked at the issue of implementation of recommendations from the twoday conference Prizren and UNESCO Inclusion Alternatives, organized by the Municipality of Prizren on 16 and 17 May 2013 in Prizren.Download
Management of public money core element of responsible governance03.08.2014Today, in Prizren, EC Ma Ndryshe held roundtable Public money as dads money. Panellists at this roundtable were Lulzim Kabashi, deputy mayor of Prizren municipality, Zenel Ahmetaj, coordinator at the Directorate of Economy and Finances, Qerkin Morina, representative from the Office of the Auditor General and Naim Cahani from Kosova Democratic Institute.Download
Municipality of Mamuşa/Mamushë failing to implement the Auditors recommendations22.07.2014Within the project of overseeing the work of local government of Mamuşa/Mamushë Municipality, in July, EC Ma Ndryshe has lloked at the findings of the Audit Report on the Financial Statements of the Municipality of Mamuşa for the year 2013 (http://oag-rks.org/repository/docs/3._Report_Mamushe_13_ENG_FINISHED_READY_FOR_PRINT_792781.pdf), with a retrospective look at the reports for the years 2012, 2011, 2010 and 2009.Download
Treatment of constructions without permit within Protective Zones13.06.2014Days ago, the Ministry of Environment and Spatial Planning has released the draft of Administrative Instruction on Basic Health and Safety Requirements for Treatment of Constructions without Permit, pursuant to the Law on the Treatment of Constructions without Permit, which is in effect from 5 February 2014.
Regarding the Law on the Treatment of Constructions without Permit as well as the aforementioned Administrative Instruction, we do take this opportunity to caution about certain aspects concerning the architectural heritage and protected zones. According to Article 12, section 2.7 of the Law states, inter alia, that, Inspections of unpermitted construction should determine that the Applications for legalization shall be refused if, after inspection, the competent body finds it is built in the protected zones and special zones of cultural heritage.Download
Regarding the Law on the Treatment of Constructions without Permit as well as the aforementioned Administrative Instruction, we do take this opportunity to caution about certain aspects concerning the architectural heritage and protected zones. According to Article 12, section 2.7 of the Law states, inter alia, that, Inspections of unpermitted construction should determine that the Applications for legalization shall be refused if, after inspection, the competent body finds it is built in the protected zones and special zones of cultural heritage.Download
First steps on the mapping of structures built without a construction permit in Pristina12.05.2014As part of the Online Transparency of Pristina Municipality project, EC Ma Ndryshe, in the opening months of this year, has developed and tested a methodology for identification and mapping of structures built without construction permits. The primary objectives of this methodology were the on-the-site scanning of constructions, identification and recording of violations and graphical presentation of their expansion on the map. The purpose of identification is a disclosure of construction violations in Pristina as well as to raise the level of transparency of the Directorate of Urban Planning, Construction and Environmental Protection in the Municipality of Pristina.Download
Remainder: MUNICIPALITY OF PRIZREN WITH A NEGATIVE COUNT IN THE IMPLEMENTATION OF RECOMMENDATIONS 08.05.2014During 2013 and the first four months of 2014 within the project of monitoring the transparency of Prizren municipal government, EC Ma Ndryshe has disclosed the findings from various researches and thereto has provided recommendations for improving the situation in certain departments. Furthermore, our organization has reacted on sensitive issues as well requiring proper action by the responsible ones of Prizren Municipality.Download
DUSP issues no permit yet the DPS allows the setting up of the amusement park29.04.2014Within the project of overseeing the transparency of the municipal government of Prizren, EC Ma Ndryshe, over the past months, has addressed again the issue of setting of the amusement park (Luna Park) near Sezai Surroi Sports Centre in Prizren following the complaints received from the residents living in immediate quarters.Download
Prizren Municipality with shortcomings in budgetary performance25.03.2014Within the project of overseeing the transparency of municipal executive of Prizren, EC Ma Ndryshe in March has looked at the financial statements of the Municipality of Prizren for the period from January to December 2013.Download
Historic Centre of Prishtina counts its last days19.03.2014The narrative of Prishtina begins with its Historic Zone. Founded since the XIII century, records reveal that this quarter is the only part of the urban fabric containing autochthonic and environmental heritage values. By the time referred to as a village and until the time acquiring the shape of the capital city of the present-day, Prishtina was preceded by clustered development of its city core.Download
Status of Urban Regulatory Plans in the Municipality of Prishtina19.03.2014The project for overseeing transparency of the Directorate of Urbanism, Construction and Environmental Protection of Prishtina Municipality aims at elevating the level of transparency in local decision-making through monitoring the executive branches of municipalities and reporting on local decision-making practices. Part of the project will also be technical assistance for bringing urban order in Prishtina.Download
Delayed access to public documents by the Municipality of Prizren27.02.2014Within the project of transparency monitoring of Prizrens municipal executive branch, EC Ma Ndryshe, in February, has looked at the efficiency of municipal administration in allowing access to public documents during the last year in accordance with relevant law.Download
Delay in the appointment of directors inexcusable message to the citizens01.02.2014EC Ma Ndryshe is tracking with a concern the delays in the appointment process of the directors
of Prizren Municipality. Although almost two months have passed from the certification of final
local election results of 2013 by the CEC for the assemblies and municipal mayors, the executive
body of Prizren Municipality has not yet been established. So far, the mayor of Prizren has failed
to provide credible reasons for this lag, which is affecting the overall dynamics of local
governance and on the work performance of the executive. To this situation has preceded the
election campaign period and two rounds of mayoral elections, which is characterized with a
dreadfully low dynamics of works executed by local government.Download
Transparency enhances services and municipal governance28.01.2014Within the project of monitoring the transparency of Prizrens municipal executive, EC Ma Ndryshe, during January, has looked into the issue of a research contracted by the local government titled Improvement of municipal services, accountability and the development of local economy.Download
Mamuşa/Mamushë Municipality to increase the collection of own source revenues29.12.2013Within a project for monitoring the transparency of Mamuşa/Mamushë municipal executive, EC Ma Ndryshe during December has looked at the issue of the collection of own source revenues planned for the year 2013.Download
Prizren Municipality to increase activities for debts collection26.12.2013As part of a project for monitoring the transparency of Prizrens municipal executive, EC Ma Ndryshe during December has looked at the issue of the collection of planned own source revenues for the year 2013.Download
Mamuşa/Mamushë Municipality to provide a greater importance to the Tomato Festival 26.11.2013Within the project of transparency oversight of Mamuşa/Mamushë municipal executive, in November, EC Ma Ndryshe has looked at the issue of municipal governments expenditures related to the organization of the Tomato Festival.Download
Prizren Municipality continues with the devaluation of public money 15.11.2013Within the project of transparency oversight of Prizren municipal executive, EC Ma Ndryshe, during October, has looked into the issue of expenditures in the first six months of 2013.Download
Municipality of Prizren violates the Law on Access to Public Documents 03.10.2013Within the project of monitoring the transparency of the executive branch of Prizren Municipality, EC Ma Ndryshe, during September, has examined the issue of implementation of the Law on Access to Public Documents, as it has received complaints for violations in this regard.Download
Municipality of Mamuşa/Mamushë to implement the recommendations of the Auditor General29.09.2013In the framework of the project for overseeing the work of the executive of Mamuşa/Mamushë Municipality, EC Ma Ndryshe, during September, has reviewed the issue of the findings in the Report of the Auditor General (can be found at the following link, http://www.oag-rks.org/repository/docs/MAMUSHE_Report_ENG_45216.pdf) on the financial statements of the Municipality of Mamuşa/Mamushë for the year 2012.Download
Municipality makes double payment of an invoice for maintenance and repair of the Mayors vehicle06.09.2013On the Audit Report of the Office of the Auditor General (can be downloaded at http://www.oag-rks.org/repository/docs/RaportiAuditimit_KPZ_2012_Eng_36581.pdf) it is noted that, Municipality made expenditures with no contract and without procurement procedures for maintenance and repair of the Mayors vehicle, in the amount of 3,977, expenditures that relate to periods from 2008 to 2012. Moreover, this state authority has also encountered a double payment of the invoice by the municipal budget. We reviewed these payments and noticed a double payment for the invoice 1892/S in the value of 336. This invoice was introduced in the invoice summary No. 001 dated 10.04.2012 and also as a separate invoice dated 12.12.2011, states on the OAGs Report.Download
Municipal government of Prizren misusing municipal budget year after another 19.08.2013Within the project of overseeing the performance of the municipal executive of Prizren, EC Ma Ndryshe has examined the findings of the Audit Report on the Financial Statements of the Municipality of Prizren for the year ended in 2012 with a retrospective look at the reports for the years 2011, 2010, 2009 and in 2008.Download
As of next year the Sports Centre to prohibit the setting of the amusement park29.07.2013Concerns about this issue have been raised by different groups of citizens at the meetings which EC Ma Ndryshe has held with various groups of society as part of the project Inclusive City Participatory planning for sustainable urban development in Prizren. Women and senior citizens living in the quarters nearby the Sports Centre have complained that the placement of an amusement park has violated the peace and quiet of residents living in these areas. They have pointed out for noise pollution going on far into the night and citizens are being denied from leisure time in the greenery of this Centre.Download
Mamuşa/Mamushë Municipality to control expenditures in the second half of the year26.07.2013Properly to the request submitted for access to public documents, monitoring staff have obtained a half-yearly financial report of the municipality of Mamuşa/Mamushë, which provides a general overview on the revenues and expenditures of the municipality. After pulling out the data, the monitors again have consulted the officials of the Directorate of Finance to confirm the authenticity of the records, which are disclosed below.Download
To end the practice of collecting money from schoolchildren15.07.2013Over the past months EC Ma Ndryshe has received individual complaints from parents and schoolchildren about the money sought from the management of public schools in Prizren for the payment of security, maintenance, repairs of sanitation or for additional payments. By submitting concern for the spread of this occurrence, parents have also complained about the lack of transparency in the managing and spending of these additional funds.Download
Mamuşa/Mamushë Municipality vows for improvement of online transparency 05.07.2013Online transparency monitoring has revealed pronounced deficiencies in this regard. Municipal official website and communication with the public is not at the required level and it is characterized with the absence of communication of basic information to the citizens. Updating of the data on the website is not done in any of the official languages of the municipality of Mamuşa.Download
Brezovica project threatens the destruction of rare natural values01.07.2013Proceeding from the public call for reporting cases of legal violations committed by institutions, EC Ma Ndryshe received a notification of a group of citizens in relation to a project, respectively the Master Plan for Brezovicë/Brezovica. The concern raised relates to the risk that the project would harm natural values of the National Park Sharri.Download
Investments of the municipality in the house of Shuaip Pasha, without an elaborated planning 15.06.2013The research of EC Ma Ndryshe has revealed the fact that municipal government, respectively the Directorate of Urbanism and Spatial Planning has begun the implementation of the project without fully clarifying property disputes between the legitimate owners of this building; meanwhile, there was no clear plan or final designation of this house, that once has used to represent an exceptional value of Prizrens urban architecture.Download
Naming of the school in Mamuşa/Mamushë in quod of institutional [mis]communication01.06.2013Within the project of monitoring the work of the municipal executive of Mamuşa/Mamushë, in May EC Ma Ndryshe has reviewed the issue of re-naming of the Lower Secondary School in this municipality.Download
Municipality powerless in stopping extensions in the construction of high-rise buildings29.05.2013EC Ma Ndryshes research has revealed that the municipal government, notably the Directorate of Inspections remains powerless in stopping exceeding of new collective residential buildings. Consequently, drastic exceeds of the construction permits of the high-rise buildings has become a chronic phenomena in the city of Prizren.Download
Directorate of Inspections in the absence of a list of buildings for demolition14.05.2013Over the past few weeks, within the project of monitoring the work of Prizrens municipal executive, EC Ma Ndryshe has reviewed the issue of the demolition of structures built without e permit by the Directorate of Inspections.Download
Prizrens primary health care facing many deficiencies in organizing the on-duty work20.03.2013As part of the project of monitoring the work of the municipal executive of Prizren, during the first half of March EC Ma Ndryshe has considered the issue of reimbursement of the on-duty work in primary health care in Prizren municipality.Download
Municipality of Prizren to find a lasting solution on the issue of public lighting 08.03.2013As part of the project of monitoring the work of Prizrens municipal executive, EC Ma Ndryshe, during the second half of February, has reviewed local governments commitments in improving municipal utilities.Download
Prizren Municipality concluded the year 2012 with outstanding bills in the amount of 933,00020.02.2013Within the project of monitoring the operations of Prizrens municipal executive, EC Ma Ndryshe, during the February, has reviewed the municipalitys financial statements for the period from January to December 2012.Download
Transparency in Prizren Municipality still depleted08.02.2013As part of the project of monitoring the work of the municipal executive of Prizren, EC Ma Ndryshe, in the second half of January, has reviewed aspects related to the transparency of the municipality towards the public.Download
The campsite in Prevallë/Prevala: Off the URP, with an expired contract and manifold errors22.01.2013Within the project of monitoring the transparency of Prizren municipal executive, EC Ma Ndryshe, in the first half of January, has continued with reviewing of matters relating to current developments in Prevallë/Prevala.Download
Municipality re-tenders the project subject to investigation26.12.2012During December EC Ma Ndryshe continued to monitor the work of the executive branch of Prizren Municipality. The focus of oversight over this period were the sector of urban planning, respectively implementation of the project for regulation of infrastructure in Prevallë/Prevala resort.Download
Regulation on Treatment of Structures Built without Permit an illicit copy23.11.2012Within the project of monitoring the transparency of municipal executive of Prizren, EC Ma Ndryshe, last month, had reacted regarding the errors on the process of drafting and adoption of Regulation on Treatment of Structures Built without Permit by the Municipal Assembly of Prizren.Download
Reminder: Local government to reflect and operate upon the recommendations of civil society 09.11.2012During the past two months of overseeing the work of Prizren municipal government, EC Ma Ndryshe has published different research findings and, along with those, has provided several recommendations for improving the situation in certain departmental sectors. Download
Prizren Municipality and the Municipal Assembly ignore the MLGAs request25.10.2012EC Ma Ndryshe has obtained the explicatory letter from the Ministry of Local Government Administration (MLGA) directed to the municipalities of Kosovo, whereby clarifies that the limitations imposed for municipal public services to citizens with the payment of debts towards Regional and Local Public Enterprises, have no legal grounds and as such cannot be applied.Download
Senior municipal officials working in education04.10.2012During the second half of the month September the monitors of EC Ma Ndryshe have looked into the education sector, respectively the employment of senior officials of municipal executive in primary and secondary schools of Prizren municipality.Download
To end the practice of public investments in disputed properties 22.09.2012Within the monitoring of activities of Prizren Municipalitys executive branch, EC Ma Ndryshe, during September, was engaged in the review of joint investments implemented in partnership between central and local government. During research conducting, EC Ma Ndryshe has encountered a disturbing case due to the investment of public money in a land area which continues to be subject of property dispute, currently under the scrutiny of the Supreme Court of Kosovo.Download
Non-compliance to construction requirements to be sanctioned by the institutions14.09.2012We have continued with the oversight of Prizren Municipalitys executive work in September. During this cycle, the focus of monitoring were the sector of urban planning and that of the inspections; respectively, constructions in the Historic Centre of Prizren. EC Ma Ndryshe, herein, expresses concern with situation emerged in the field of urban and spatial planning in the Historic Centre of Prizren, where constructions do continue by non-adherence to the construction licenses issued from the DUSP.Download
Misappropriation and devaluation of public money in Prizren27.08.2012EC Ma Ndryshe continued with the oversight of the operations of Prizren Municipalitys executive branch in August as well. In this period, monitoring was focused on the expenditures of municipal executive of Prizren for the first half of the year 2012 and on residential tower blocks constructed out of urban requirements.Download
Over 18.000 EUR on official trips17.08.2012A largely worrying aspect of the conclusions rendered by the mayor is the manner of public money expenditure on the official trips of Prizren Municipalitys officials. Within the period of seven months of 2012, over 18.000 EUR were spent for the official trips from the municipal budget. Download
Finally Investigations on urban crime in Prizren09.08.2012EC Ma Ndryshe welcomes this undertaking of the judicial and law enforcement authorities, which is taking place following the regular reporting of our organisation over the last few months regarding urban irregularities in Prizren. Download
Evidences of urban degradation in Prizren17.07.2012EC Ma Ndryshe has continued to oversee the work of municipal executive during the month of July. In this period, the focus of oversight had been set on the sector of urban planning and the constructions within the Historic Centre of Prizren. Just in the first six months of 2012, the Institute for Protection of Cultural Monuments in Prizren had issued 62 consents for constructions or interventions within the Historic Centre of Prizren. It is disturbing that a considerable number of constructions do not follow the original project designs and the construction permits issued by the municipal authorities. Although do not retain any obligation whatsoever for proceeding requests to the Directorate of Inspection, this Institute, in the past three years, has sent over 25 requests for ceasing the construction works or for demolition of those constructions for non-adherence to the project in line with the consent issued by the Institute and in accordance with the principles envisaged for cultural heritage in the Historic Centre of Prizren.Download
The Auditor General corroborates concerns of the civil society on poor governance of Prizren Municipality10.07.2012Office of the Auditor General of the Republic of Kosovo in the past couple of days published the 2011 Annual Audit Report for the Municipality of Prizren. We are deeply alarmed that the findings of this report indicate the incapacity of Prizren Municipality for good governance and transparency when it comes to public money. Once again, the Annual Audit Report has highlighted many facets of bad governance that civil society has already being speaking about for a long time now. Download
Urban degradation of the Historic Centre of Prizren27.06.2012Monitoring of the affairs of the executive branch of Prizren Municipality continued in June as well.
During this period, the focus of the monitoring was on the urban planning division and that of culture. Download
During this period, the focus of the monitoring was on the urban planning division and that of culture. Download
Poor management of the school budget and flawed healthcare services14.06.2012EC Ma Ndryshe continued with the oversight of executive branch of Prizren Municipality in May as well. What is worth pointing out is that the decisions (conclusions) of the Mayor of Prizren Municipality, brought in May 2012, have not been released on the municipal website. This fact clearly indicates the lack of transparency of municipal executive in relation to citizens. EC Ma Ndryshe requires from the Mayor of Prizren Municipality that the doors of his meetings with the directors of directorates (Board) be open for civil society and the media, in order to increase transparency in decision-making by the municipal executive. Download
The Mayor of Prizren Municipality without a Work Plan05.05.2012EC Ma Ndryshe expresses its concern regarding the lack of the Work Plan from the part of the Mayor of Prizren. In our application addressed to the Mayor of Municipality to grant us access to the Annual Work Plan for 2012 and for decisions taken since the beginning of the year 2012 and the manner of publication of the decisions brought by the Mayor; we have received a reply from the municipal officials stating, You may find the Mayors Report and his decisions (conclusions) in the website of the Municipality of Prizren. Download
Prizren Municipality in hardship with transparency of its executive branch16.04.2012Pursuant to the Law on Access to Public Documents and municipal Regulation on Transparency, non-governmental organization EC Ma Ndryshe has submitted application to the Mayor of Prizren, Mr. Ramadan Muja, Directorate of Education and Directorate of Health. The application, as such, was filed on 02.04.2012, bearing a protocol number 01/031-3411; in which the cabinet of the Mayor of Municipality was requested to provide us access to the Mayors Annual Work Plan for the year concerned.Download